Tilford Road Farnham

The scheme comprised of a 2.8 Km potable water pipeline constructed from 250mm ductile iron pipes with 1 bridge crossing and 3 no connections into the existing network.

500 metres through open country side.

2300 metres open cut through the public highway, Tilford Road under a full road closure.

We tested the pipeline to 21Bar pressure and chlorinated it in 2 sections prior to making the final connections to the existing network.

The scheme was completed 4 weeks ahead of schedule.

Tilford Road 250 DI Potable Water Main
Tilford Road 250 DI Potable Water Main
Tilford Road Top Soil Re-instatement
Tilford Road Field Section Completion
Tilford Road Open Trenching
Tilford Road Open Trenching